ALE Heavylift performing a site movement of an LNG tank platform and transport frame in Australia, weighing 350t in total.
The platform measured 46.2m long x 23.3m wide x 11m high. It was transported using 58 axle lines of SPMTs, Self propelled Modular Transporters